Confirm the characteristics of your main line and of the secondary lines that derive from it, to define a components list.
Study the route from the main line that the secondary lines have to take and choose the components and pipework needed.
Define the types of end of line attachments required and choose the appropriate components.
Verify the pipeworkâs route from B to C and choose the quantity of pipework and the components needed.